We Offer A Variety Of Maintenance Services
To Cover All Your Silver Eagle Needs
At PropJet 210 Aviation our expert technicians have over 60 years of experience with Cessna P210s, 340s, and Silver Eagles. Our knowledge of these airframes and motors is unmatched. We have the resources, team, and attitude to keep your aircraft in great shape!
-
Annual Inspections
-
50-100 Hour Inspection
-
Pre-buy Inspections
-
Windshield Scratch Removal
-
Windshield Replacement
-
Pressurization Repair
-
AutoPilot Repairs
-
Landing Gear Troubleshooting / Rigging
-
Tail Mods
-
Tip Tank Installation
-
Speed Brake Installations
-
LED Nav, Strobe, and Beacon Installation
-
Engine Removal / Installations
-
Turbine Engine Control Rigging
-
Hot Section / Turbine Enhancement
-
Oil Changes
-
Prop Profiling / Balancing
-
Prop Servicing
-
De-Ice Boot Installation
-
De-Ice Boot Servicing
-
Tire / Brake Replacement
-
Air Conditioning Servicing / Troubleshooting
-
MT Composite Prop Sales
-
Surface Control Rigging
Turbine Engine
Turbine Engine Compressor Section Installation | Turbine Engine With Removed Compressor Section | Compressor and Inlet |
---|---|---|
Compressor Case | Compressor With Case Off | Compressor Rotors |
Inside Compressor Stator | Model Engine With Compressor Case Off | Model Turbine Engine With Cutaways |
Model Turbine Engine With Cutaways |
Piston Engine
Piston Engine With Cylinders Removed | Piston Engine With Cylinders And Connecting Rods Removed | Piston Engine With Cylinders And Connecting Rods Removed |
---|---|---|
Cylinders Removed And Supporting Connecting Rods | New vs Old Spark Plugs | New Cylinders, Pistons, and Connecting Rods |
New Superior Cylinders | Reconditioned Continental Connecting Rods | Prepping To Remove Cylinders |
Removed Cylinder Heads | Removed Cylinders And Connecting Rods | Installing New Cylinder |
Removal Of Continental Engine | Removal Of Continental Engine | Replacing Engine |
Excessive Valve Wear Causing Low Compression |
Spar Inspections
Failed Carry Thru Spar Inspection | Replaced Carry Thru Spar | Removed Headliner To Access Spar For Eddy Current Test |
---|---|---|
Removed Headliner To Access Spar For Eddy Current Test | AD Spar Inspection, Zinc Painted To Prevent Corrosion | AD Spar Inspection, Zinc Painted To Prevent Corrosion |
AD Spar Inspection, Zinc Painted To Prevent Corrosion | Holes in spar prompting replacement | Bracing For New Spar Installation |
Bracing For New Spar Installation | New Spar Installation | New Spar Installation |
New Spar Installation | New Spar Installation | New Spar Installation |
Old Spar Before Removal | Removed Spar | Removed Spar |
New Spar Installed | New Spar Installed |
Tail Mod
New Bracket vs Old Bracket | New Bracket vs Old Bracket | New Brackets For Tail Mod |
---|---|---|
New Brackets For Tail Mod | Tail Section With New Brackets, Painted Zinc To Prevent Corrosion | Tail Section With New Brackets, Painted Zinc To Prevent Corrosion |
Old Brackets | Brackets Removed For Tail Mod | New vs Old Brackets |
New Bracket For Tail Mod | Performing Tail Mod |
Landing Gear
Powder Coated Trunion | Powder Coated Scissor Links | Disassembled Parts For Powder Coating Nose Gear |
---|---|---|
Assembled Nose Gear | Assembled Nose Gear | Assembled Nose Gear |
Powder Coated Main Landing Gear | New Cleveland Brakes | New Cleveland Brakes |
Old Brakes | New Brakes |
Windshield Replacement
Windshield Installation | Removed Windshield From Cessna P210N | Removed Windshield From Cessna P210N |
---|---|---|
Removed Windshield | New Windshield | New Windshield After We Drilled Holes |
New Windshield After We Drilled Holes | New Windshield Installation | New Windshield Installation |
LED Lights
Removing Old Nav/Strobe Lights | Installing New Nav/Strobe Lights | Newly Installed Nav/Strobe Light |
---|---|---|
Aerodynamic Cover For Nav/Strobe | Aerodynamic Cover For Nav/Strobe | Painted Cover For New AeroLED Nav/Strobe Lights |
Finished Installation Of AeroLED Nav/Strobe Lights | Custom Built Aerodynamic Cover | New AeroLED Nav/Strobe Lights |
New AeroLED Tail Navigation Light | New AeroLED Landing And Taxi Lights | New AeroLED Tail Beacon |
Sheet Metal Work
New Skin On Belly | Re-Skinning Wing Above Flaps | Re-Skinning Wing Above Flaps |
---|---|---|
Installing Gear Doors | Installing Gear Doors | Installing Gear Doors |
New Gear Doors On Conversion Plane | Newly Fabricated Co-Pilot Panel | Newly Fabricated Aircraft Panel |
Fitting New Panel |
N731JG
N731JG New Glass Panel | N731JG New Interior | N731JG New Interior |
---|---|---|
N731JG New Headliner | N731JG New Interior |